
haus
Sector: Property
Size: 2,400 sq ft Duration: 6 Weeks
haus
Sector: Property
Size: 2,400 sq ft Duration: 6 Weeks
- What we did
- Design
- Planning
- Installation
- Management
Client Challenge
As one of Sheffield’s leading independent estate agents, Haus had outgrown their previous premises and required a strategic relocation to West Bar House. The challenge was to create an exciting new workspace that balanced a high-functioning office with a welcoming, residential-style environment.
The brief demanded a design that avoided the clinical feel of traditional offices, instead opting for a brand centric, hospitality led environment that could accommodate client consultations, collaborative team sessions and high street visibility.
The relocation also required delivery within a tight programme to avoid disruption to day-to-day operations.
Our Solution
We delivered a 6-week turnkey fit out, creating a residential/office hybrid that brings the Haus brand to life, managing design and delivery as a single accountable team
Design: Developed a bespoke interior concept incorporating the vibrant Haus brand colours into a residential-style aesthetic, featuring soft seating, domestic style lighting and warm textures.
Build: Transformed the 2,400 sq ft shell through full fit out and reconfiguration, creating a cohesive flow of open plan workspaces, private client meeting zones and inviting waiting areas.
Technical: Integrated high-spec connectivity to support a fast-paced, client-facing property environment, ensuring seamless transitions between desk based work and client facing presentations.
Project Management: Managed the full relocation within a 6-week programme, ensuring continuity of operations with no interruption to service.
Results
Scalable Growth: Created a physical environment aligned with Haus’s brand as a modern, independent agency.
Brand Synergy: Created a physical touchpoint that perfectly aligns with Haus’s reputation as a friendly, independent and modern agency.
Client Experience: Enhanced the customer journey through dedicated consultation spaces designed to feel welcoming rather than corporate.
Programme Delivery: Completed within a 6-week programme, enabling a seamless transition into the new space.
“We are absolutely thrilled to bits with our new Haus! Thank you all so much.”

.png&w=640&q=90)

-1080x1230.jpg&w=640&q=90)